| Filename | Size | Last Modified |
| PM2.5、PM10浓度计算报告/ | Wed, 16 Mar 2022 04:12:27 GMT | |
| SelfReport/ | Wed, 16 Mar 2022 16:16:42 GMT | |
| ZipFile/ | Wed, 16 Mar 2022 15:50:46 GMT | |
| designImgFile/ | Wed, 16 Mar 2022 12:35:15 GMT | |
| proImgFile/ | Wed, 16 Mar 2022 12:35:15 GMT | |
| report/ | Wed, 16 Mar 2022 16:19:08 GMT | |
| reports/ | Wed, 16 Mar 2022 04:55:10 GMT | |
| 专用接驳车服务的实施方案/ | Tue, 15 Mar 2022 17:51:27 GMT | |
| 主要构件隔声性能检测报告/ | Wed, 16 Mar 2022 04:39:00 GMT | |
| 体现绿地向社会公众开放的相关文件/ | Wed, 16 Mar 2022 00:00:03 GMT | |
| 健身设施现场照片/ | Tue, 15 Mar 2022 22:55:50 GMT | |
| 健身设施的相关产品说明书/ | Tue, 15 Mar 2022 22:40:48 GMT | |
| 动态采光计算书/ | Wed, 16 Mar 2022 04:47:25 GMT | |
| 可调节遮阳设施的面积占外窗透明部分比例计算书/ | Wed, 16 Mar 2022 07:39:38 GMT | |
| 场地周边公共交通设施布局示意图/ | Tue, 15 Mar 2022 17:40:25 GMT | |
| 场地周边公共设施局部图或规划图、步行路线图/ | Tue, 15 Mar 2022 22:23:27 GMT | |
| 场地地形图/ | Tue, 15 Mar 2022 16:53:46 GMT | |
| 外门窗施工工法说明文件/ | Wed, 16 Mar 2022 02:51:58 GMT | |
| 室内空气污染物浓度预评估分析报告/ | Wed, 16 Mar 2022 04:11:35 GMT | |
| 室外风环境模拟计算分析报告/ | Wed, 16 Mar 2022 07:36:06 GMT | |
| 平面日照等时线模拟图/ | Tue, 15 Mar 2022 23:58:12 GMT | |
| 建筑专业图纸与设计说明/ | Tue, 15 Mar 2022 17:15:46 GMT | |
| 建筑总平面图/ | Tue, 15 Mar 2022 16:56:29 GMT | |
| 建筑节能计算书/ | Wed, 16 Mar 2022 03:57:09 GMT | |
| 开敞空间出入口实景照片/ | Tue, 15 Mar 2022 22:34:10 GMT | |
| 日照分析报告/ | Tue, 15 Mar 2022 23:08:30 GMT | |
| 标识系统的现场照片/ | Wed, 16 Mar 2022 02:07:32 GMT | |
| 标识系统的设计与设置说明文件/ | Wed, 16 Mar 2022 02:17:03 GMT | |
| 治理措施分析报告/ | Tue, 15 Mar 2022 23:39:36 GMT | |
| 环评报告/ | Fri, 11 Mar 2022 19:22:39 GMT | |
| 生态补偿方案/ | Tue, 15 Mar 2022 23:50:16 GMT | |
| 用地指标计算书/ | Wed, 16 Mar 2022 14:30:38 GMT | |
| 申报书_D000002004/ | Sat, 12 Mar 2022 23:46:57 GMT | |
| 申报声明_D000002004/ | Sat, 12 Mar 2022 23:45:55 GMT | |
| 申报声明_D000002005/ | Sat, 12 Mar 2022 23:47:50 GMT | |
| 规划设计平面图/ | Tue, 15 Mar 2022 21:49:32 GMT | |
| 设施向社会共享的管理办法、实施方案、使用说明及工作记录文件/ | Tue, 15 Mar 2022 22:09:07 GMT | |
| 项目区位图/ | Tue, 15 Mar 2022 16:54:16 GMT | |
| 项目现场的实景照片/ | Tue, 15 Mar 2022 23:36:37 GMT |